CHILLER REPLACEMENT
Delta provided electrical engineering design services for the replacement of chillers, starters, and associated equipment at the DuPage County power plant. Four existing chillers (3-1,000 ton; 1-300 ton) were replaced with three new chillers (1-2,000 ton; 2-1,000 ton).
The electrical engineering scope included:
- Reconfiguration of existing 5 kV switchgear to accommodate 600A power to new chillers
- Reconfiguration of existing Variable Frequency Power Supply (VFPS, 600A/480V/3-PH) to accommodate power to two new 200HP chilled water pumps
- Reconfiguration of existing Motor Control Center (MCC, 600A/480V/3-PH) to accommodate power to new water pumps and fans
- Design was provided such that the power plant would remain in operation throughout entire demolition process
BOILER #2 UPGRADE
Delta provided mechanical, electrical, & controls engineering design services for upgrades to boiler #2 at the DuPage County Power Plant.
Boiler # 2 (model DW-86) was a hot water generator with a capacity of 45,000,000 BTUH. All of the power plant’s hot water generators at the time were dual-fuel, gas-oil fired units. Scope of work, including PS&E, involved the following:
- Reviewed all existing electrical and piping work
- Surveyed all components such as actuators, linkage, limit switches, shaft extensions, motorized shut-off valves, and meters
- Removed and replaced the existing pneumatic controls & safety devices
- Installed a new PID controller for automatic fuel and air flow regulation. The controller also manages metering, cross limiting combustion, and O2 trim.
- Replaced the two boiler pressure relief valves
- Modified electrical and piping work where needed
CLIENT
DuPage County Facilities Management
PROJECT LOCATION
410 N County Farm Road
Wheaton, IL 60187
DELTA’S ROLE
Prime
SERVICES PROVIDED
Mechanical Engineering
Electrical Engineering
PROJECT COMPLETION
Chiller – 2002
Boiler #2 – 2009