LAGRANGE ROAD OVER MULTIPLE FEATURES

BRIDGE LIGHTING

PROJECT DESCRIPTION

Delta provided Phase II electrical engineering services on two LaGrange Road (US-12/20/45) bridges crossing over multiple features: Illinois & Michigan Canal, Illinois Central Railroad, Chicago Sanitary & Ship Canal, BNSF Railroad, and the Des Plaines River. This project includes reconstructing northbound bridges, pavements, and upgrading lighting. Both bridges are classified as ‘major river bridges’. The lighting layout design parameters included:

  • Luminaire performance comparison table which ensures the proposed design can be achieved by more than one manufacturer
  • Lighting level calculations using a R3 pavement type
  • Pole spacing specification at increments of 5’

Delta coordinated with the local electrical utility company for service voltage and ampacity, documenting protection suitable for maximum available fault current. Load tabulations for each circuit and overall electric service were performed along with voltage drop calculations and cable sizing. Electric service is a low voltage (0-600 volts) grounded system.

The selected lighting hardware was aluminum poles with a 50’ mounting height, 12’ mast arm, 400 watts HPS equivalent LED luminaires, and spaced 260’ apart for optimal lighting. To reduce the bridge vibrations, a damper is located midway inside the poles.

Both northbound bridges will have new light poles, conduits, and LED fixtures. For the southbound bridge, the existing lighting layout and condition (conduits and wiring) were suitable for reuse. The luminaires were retrofitted with modern LED equivalents.

Temporary navigational and obstruction lighting (LED) will be provided during construction and proposed navigational and obstruction lighting (LED) will be attached to the northbound bridge structure. Lighting meets both IDOT and United States Coast Guard requirements. All exposed conduits are RGS PVC coated. All cables/conduits to the navigational/obstruction lighting system have been replaced. The existing control box will be maintained and as will existing service to the controller.

CLIENT

Illinois Dept. of Transportation, District 1

PROJECT LOCATION

Willow Springs & Hodgkins, IL

DELTA’S ROLE

Subconsultant

SERVICES PROVIDED

Electrical Engineering

DESIGN SCHEDULE

10/2019 – 04/2022

CONSTRUCTION SCHEDULE

04/2022 – 05/2024

CONSTRUCTION VALUE

$24,644,574