I-90 east bound Over Higgins Creek

NEW BRIDGE DESIGN

PROJECT DESCRIPTION

Project limits for I-90 (Jane Addams) east-bound widening are between Elmhurst Road and the I-490 (EOWA) interchange. Proposed improvements include:

  • New I-90 EB collector distributor road with three 12’-0” traffic lanes
  • I-90 EB CD entrance ramp Y3 from Elmhurst Road interchange
  • I-90 EB CD exit ramp X1 to EOWA interchange
  • Elmhurst road east bridge approach pavement restoration
  • I-90 EB CD Bridge over Higgins Creek
  • Noise abatement wall
  • Drainage design and calculations
  • Signage, MOT, and utility coordination

Delta structural engineers provided concept verification and PS&E design services for the I-90 EB CD Road over Higgins Creek (SN 535CD). This structure has the following features:

  • Single 115’-0” span
  • Right-forward 13° skew
  • 57’-4” out-to-out & 110’-1/4” back-to-back of abutments
  • IL54-3838 PPC Beams
  • Open integral abutments on 14” metal shell piles

PROJECT CHALLENGES

During construction, the contractor encountered an abandoned underground 120″ diameter watermain.  This required expedited redesign of abutments, approach pile bents and pile spacing to accomodate the large obstruction.

CLIENT

Illinois State Toll Highway Authority

PROJECT LOCATION

I-90 & I-490 Interchange

DELTA’S ROLE

Subconsultant

SERVICES PROVIDED

Structural Engineering

DESIGN SCHEDULE

12/2017 – 06/2018

CONSTRUCTION SCHEDULE

08/2018- 05/2019

CONSTRUCTION VALUE

$4,385,014

PROJECT SORT LINKS

PROJECT PHOTOS

Taken on 6/28/2019 and depict the completed bridge and 30′ approach slabs. the remaining transition slabs will be constructed with the roadway contract.