Metra Consolidated Control Facility

New Generator & UPS System

PROJECT DESCRIPTION

Delta provided engineering design and construction phase services for backup power modernization at Metra’s Consolidated Control Facility. The work included replacement of existing generator, Uninterruptible Power Supply (UPS), and exhaust ventilation.

PS&E design included existing room layout, demolition plans, new equipment layout, and construction phase drawings.

ELECTRICAL

The existing 600kW diesel generator was removed along with its fuel tanks,batteries, and related components. The new replacement is a 625kW natural gas generator. During construction, a temporary 600kW diesel generator provided backup power until installation of the new generator.

Other electrical work included new:

  • UPS system with 300kW capacity
  • Integrated Distribution Cabinet (IDC)
  • Underground gas piping connections from the generator building to the main building

MECHANICAL

Mechanical plans redesigned the ductwork and muffler for compatibility with the new natural gas generator.

CLIENT

METRA

PROJECT LOCATION

Chicago, IL

DELTA’S ROLE

Subconsultant

SERVICES PROVIDED

Mechanical Engineering

Electrical Engineering

DESIGN SCHEDULE

2020 – 2021

CONSTRUCTION SCHEDULE

2022 – 2023

CONSTRUCTION VALUE

$1,240,000

PROJECT SORT LINKS

PROJECT PHOTOS

Photo taken of existing generator to be replaced