SOUTH SHORE LINE, NEW CREW FACILITY

AT MILLENNIUM STATION

PROJECT DESCRIPTION

Delta as sub-consultant, provided multi-discipline engineering services for a new crew facility at the South Shore Line’s Millennium Station. Delta provided PS&E for both conceptual and final design. All work was performed per latest ASHRAE and City of Chicago building codes, as well as state codes.

Scope of work included:

  • Design calculations and layout plan for heating, air conditioning, plumbing, and fire protection systems
  • Variable Air Volume (VAV) system for offices, locker room lounge area, restrooms, and sleeping rooms
  • Plumbing and light fixture selection
  • Utility survey of available gas, water, and sanitary drainage connections
  • Fire sprinklers system analysis and design
  • Lighting, power, and fire alarm system design, with plans showing panel locations, circuits, conduits, and cable sizes

CLIENT

Northern Indiana Commuter Transportation District

PROJECT LOCATION

151 N Michigan Ave

Chicago, IL 60602

DELTA’S ROLE

Subconsultant

SERVICES PROVIDED

Mechanical Engineering

Electrical Engineering

Plumbing Engineering

Fire Protection Engineering

PROJECT DATES

06/2000 – 10/2005